Water resources and hydrogeology
Baseline assessment of water resources and hydrogeological conditions within the project’s area of influence.
Search the website
Type at least 2 characters to see results.
Searching…
No results found. Try another keyword.
Feasibility-stage ESIA for MJAM’s Baghdara Hydropower Project in Parwan and Kapisa, combining environmental and social baselines, laboratory analysis, climate and disaster-risk assessment, and practical safeguards planning.
Daira Sabz Consulting & Engineering Group led the environmental and social impact assessment for the proposed Baghdara Hydropower Project as part of its feasibility study for MCC-JCL Aynak Minerals Company Ltd. (MJAM). Located in Parwan and Kapisa, the project is intended to supply electricity to the Aynak Copper Mine and surrounding communities.
The assignment connected physical, biological and socio-economic baseline studies with impact assessment, stakeholder engagement and safeguards planning. Field evidence and laboratory analysis informed the assessment of environmental sensitivities, community impacts and project risks.
The assessment referenced Afghanistan’s environmental requirements, IFC Performance Standards and the World Bank Environmental and Social Framework. Climate and disaster-risk analysis extended the focus to resilient planning, emergency preparedness and long-term environmental and social management.
The documented assessment coverage is listed below. Environmental and social baselines are complemented by specialist climate and disaster-risk studies.
Baseline assessment of water resources and hydrogeological conditions within the project’s area of influence.
Water sampling and testing of physical, chemical and biological parameters at Daira Sabz’s Kabul laboratory.
Assessment of sedimentation conditions as part of the physical environmental baseline.
Assessment of soil and geological conditions, supported by field investigation and soil sampling.
Assessment of existing air-quality and noise conditions to inform impact evaluation and mitigation planning.
Assessment of biological conditions, including vegetation, wildlife and biodiversity sensitivities.
Study of socio-economic conditions and potential effects on communities, informed by stakeholder engagement.
Consideration of cultural heritage within the environmental and social assessment scope.
Assessment of hydrometeorological conditions and climate-change implications for resilient project planning.
Assessment of flood, landslide and seismic hazards, together with dam-safety considerations.
A multidisciplinary, risk-based assessment linked site conditions with management priorities.
Combine field surveys, sampling, technical measurements and laboratory analysis across physical, biological and social study areas.
Examine environmental and community impacts alongside climate, disaster and dam-safety risks.
Connect technical assessment with stakeholder consultation, community concerns and grievance-redress arrangements.
Translate findings into environmental and social management planning, monitoring, emergency preparedness and institutional capacity-strengthening measures.
Hydropower decisions connect energy needs with river systems, biodiversity, community livelihoods and safety. This assignment brought these considerations together to support informed planning, practical risk management and more resilient development.
Baghdara project photographs documenting air-quality monitoring, aquatic and terrestrial biodiversity surveys, community consultations, soil sampling, groundwater-level measurement and laboratory analysis.
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Herat Province, Afghanistan
Environmental and social assessment for the Jare Takhomak marble mine within Ghaznawi Farah’s Herat project, combining baseline studies, field monitoring, consultation and support for NEPA review.
Herat, Afghanistan
Initial environmental examination and management planning for Fazaa Sabz’s wastewater treatment project in Arghandi, Paghman, including water, soil, air and noise assessment.
Arghandi, Paghman, Kabul, Afghanistan
Discuss your site, decision needs and study requirements with Daira Sabz—from baseline surveys and laboratory analysis to impact assessment, stakeholder engagement and management planning.