Project scope
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Search the website
Type at least 2 characters to see results.
Searching…
No results found. Try another keyword.
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Daira Sabz provided environmental monitoring services for health centers in Herat under a two-phase sub-consultancy with NESPAK. The assignment combined field measurements, sampling, laboratory analysis and technical reporting to support safe and environmentally responsible health infrastructure.
Ambient air quality monitoring (PM2.5, PM10, TSP, SO₂, NO₂, CO and O₃); daytime and nighttime noise measurements; drinking water testing; surface water analysis in Phase 1; laboratory analysis and compliance reporting.
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Field teams mobilized monitoring equipment and collected environmental measurements and water samples. Results were assessed against applicable national requirements and relevant NEPA, ASQA, WHO and US EPA reference standards, with site-specific findings and corrective recommendations.
Daira Sabz provided environmental monitoring services for health centers in Herat under a two-phase sub-consultancy with NESPAK. The assignment combined field measurements, sampling, laboratory analysis and technical reporting to support safe and environmentally responsible health infrastructure.
Field teams mobilized monitoring equipment and collected environmental measurements and water samples. Results were assessed against applicable national requirements and relevant NEPA, ASQA, WHO and US EPA reference standards, with site-specific findings and corrective recommendations.
Reliable environmental evidence supports safer health facilities, informed decisions and practical corrective action.
Reliable environmental evidence supports safer health facilities, informed decisions and practical corrective action.
A selection of fieldwork, sampling, testing, and site activities completed during this assignment.
Feasibility-stage ESIA for MJAM’s Baghdara Hydropower Project in Parwan and Kapisa, combining environmental and social baselines, laboratory analysis, climate and disaster-risk assessment, and practical safeguards planning.
Kapisa and Parwan, Afghanistan
Environmental and social assessment for the Jare Takhomak marble mine within Ghaznawi Farah’s Herat project, combining baseline studies, field monitoring, consultation and support for NEPA review.
Herat, Afghanistan
Initial environmental examination and management planning for Fazaa Sabz’s wastewater treatment project in Arghandi, Paghman, including water, soil, air and noise assessment.
Arghandi, Paghman, Kabul, Afghanistan
Reliable environmental evidence supports safer health facilities, informed decisions and practical corrective action.