Project scope
Initial environmental examination and management planning for Fazaa Sabz’s wastewater treatment project in Arghandi, Paghman, including water, soil, air and noise assessment.
Search the website
Type at least 2 characters to see results.
Searching…
No results found. Try another keyword.
Initial environmental examination and management planning for Fazaa Sabz’s wastewater treatment project in Arghandi, Paghman, including water, soil, air and noise assessment.
Initial environmental examination and management planning for Fazaa Sabz’s wastewater treatment project in Arghandi, Paghman, including water, soil, air and noise assessment.
Daira Sabz delivered field-based measurement, analysis, and technical reporting across the core workstreams below.
Initial environmental examination and management planning for Fazaa Sabz’s wastewater treatment project in Arghandi, Paghman, including water, soil, air and noise assessment.
Daira Sabz used a practical and standards-based delivery approach:
Fazaa Sabz Wastewater Treatment Services Company
Wastewater treatment, WASH and environmental management
Initial environmental examination and management planning for Fazaa Sabz’s wastewater treatment project in Arghandi, Paghman, including water, soil, air and noise assessment.
Initial environmental examination and management planning for Fazaa Sabz’s wastewater treatment project in Arghandi, Paghman, including water, soil, air and noise assessment.
A selection of fieldwork, sampling, testing, and site activities completed during this assignment.
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Herat Province, Afghanistan
Feasibility-stage ESIA for MJAM’s Baghdara Hydropower Project in Parwan and Kapisa, combining environmental and social baselines, laboratory analysis, climate and disaster-risk assessment, and practical safeguards planning.
Kapisa and Parwan, Afghanistan
Environmental and social assessment for the Jare Takhomak marble mine within Ghaznawi Farah’s Herat project, combining baseline studies, field monitoring, consultation and support for NEPA review.
Herat, Afghanistan
Whether you require a baseline survey, Initial Environmental Examination, full ESIA or specialist environmental study, Daira Sabz can develop an assessment approach aligned with your project, regulatory obligations and stakeholder requirements.