Project scope
Initial Environmental Examination and environmental management planning for the Fazaa Sabz Wastewater Treatment Project in Arghandi, Paghman, Kabul, assessing water, soil, air and noise conditions.
Search the website
Type at least 2 characters to see results.
Searching…
No results found. Try another keyword.
Initial Environmental Examination and environmental management planning for the Fazaa Sabz Wastewater Treatment Project in Arghandi, Paghman, Kabul, assessing water, soil, air and noise conditions.
Daira Sabz undertook the Initial Environmental Examination and environmental management planning for Fazaa Sabz Wastewater Treatment Services Company in Arghandi, Paghman, Kabul. The assignment combined assessment of water, soil, air and noise conditions with technical analysis and reporting.
For wastewater infrastructure, assessment findings can inform design choices, discharge management, pollution prevention and operating safeguards. Linking these considerations with public health, neighbouring land uses and community needs helps clients evaluate risks and plan more responsible sanitation investments. These are applications of the assessment; this assignment is not presented as treatment-plant design or construction. Relevant Sustainable Development Goals — SDG 3 (Good Health and Well-being); SDG 6 (Clean Water and Sanitation); SDG 11 (Sustainable Cities and Communities). Water, soil, air and noise assessment in Arghandi, Paghman informed the IEE and management planning for wastewater infrastructure, public health and environmental safeguards. Alignment describes thematic relevance within the documented scope, not independently measured SDG outcomes.
The work connected environmental baseline assessment with practical management planning for a wastewater treatment project. It provides a basis for considering water protection, pollution risks and environmental safeguards within the wider WASH context.
Initial Environmental Examination and environmental management planning for the Fazaa Sabz Wastewater Treatment Project in Arghandi, Paghman, Kabul, assessing water, soil, air and noise conditions.
Daira Sabz used a practical and standards-based delivery approach:
Wastewater infrastructure development in Arghandi, Paghman requires sound environmental baseline data to understand pollution risks, public health implications and nearby land uses before investment decisions.
Daira Sabz conducted an Initial Environmental Examination covering water, soil, air and noise conditions, and prepared environmental management planning recommendations for the project site.
The environmental assessment and proposed safeguards provided a factual foundation for more informed wastewater project planning by Fazaa Sabz Wastewater Treatment Services Company.
Wastewater treatment investments need to consider more than infrastructure alone. Understanding environmental conditions and potential risks helps decision-makers consider treatment and discharge arrangements, community concerns, operational safeguards and long-term environmental responsibilities. Daira Sabz connects this evidence with practical project planning.
A selection of fieldwork, sampling, testing, and site activities completed during this assignment.
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Herat Province, Afghanistan
Feasibility-stage ESIA for MJAM’s Baghdara Hydropower Project in Parwan and Kapisa, combining environmental and social baselines, laboratory analysis, climate and disaster-risk assessment, and practical safeguards planning.
Kapisa and Parwan, Afghanistan
Environmental and social assessment for the Jare Takhomak marble mine within Ghaznawi Farah’s Herat project, combining baseline studies, field monitoring, consultation and support for NEPA review.
Herat, Afghanistan
Whether you require a baseline survey, Initial Environmental Examination, full ESIA or specialist environmental study, Daira Sabz can develop an assessment approach aligned with your project, regulatory obligations and stakeholder requirements.